Dredge Operator how-to
How to Dredge to a Survey Plan
Plans prevent over- and under-digging.
Quick answer
Plans prevent over- and under-digging. In short: load; set; swing, then complete the remaining steps below.
Step by step
Load the plan.
Set the cut depth.
Swing evenly.
Watch sonar.
Advance on spuds.
Check after-dredge surveys.
Safety reminders for dredge operators
- Wear life jackets
- Stay clear of cables and lines
- Follow lockout
- Know man-overboard procedures
Key terms
Cutterhead · Hopper dredge · Clamshell · Leverman · Spud · Pipeline: see the full dredge operator glossary.
