Mining Engineer how-to

How to Plan an Open-Pit Bench Sequence

Sequencing drives production.

Updated By the Career Education Institute Curriculum Team
Quick answer

Sequencing drives production. In short: review; set; design, then complete the remaining steps below.

Step by step

  1. Review the geology model.

  2. Set pit limits.

  3. Design benches.

  4. Plan haul roads.

  5. Sequence mining.

  6. Check strip ratios.

Safety reminders for mining engineers

  • Follow MSHA rules
  • Monitor ground stability
  • Ensure ventilation
  • Plan for emergencies