Onboarding plan

Ironworker Onboarding Plan (30-60-90 Days)

A practical, printable plan to take a new ironworker from first day to full productivity.

Updated By the Career Education Institute Curriculum Team
Ironworker onboarding at a glance

Week one covers orientation, safety and shadowing. Days 1–30 build vocabulary and supervised practice on core procedures; days 31–60 move to independent work with competency sign-offs; days 61–90 focus on full productivity, cross-training and a credential plan.

Before day one

  • Confirm start date, schedule, pay and supervisor in writing
  • Verify required credentials: Apprenticeship completion, AWS structural welding certification (as applicable)
  • Prepare equipment and access: spud wrenches and sleever bars; impact wrenches; welding machines; chokers, shackles and tag lines
  • Assign a buddy or preceptor
  • Enroll the new hire in Ironworker training so foundations are covered before or during week one

Week one: orient and protect

  • Workplace tour, emergency procedures and incident reporting
  • Use fall protection at all times as required by OSHA steel erection rules
  • Stay out from under suspended loads
  • Inspect rigging gear before every lift
  • Stop work in high winds and lightning
  • Shadow an experienced ironworker through a full shift
  • Training modules 1–3: role foundations, a day on the job and essential vocabulary (15 terms)

Days 1–30: learn

Goal: perform core tasks safely under supervision.

  • Supervised practice: rig a steel beam for lifting
  • Supervised practice: make a bolted connection
  • Supervised practice: signal a crane operator
  • Training modules 4–7: duties, step-by-step tasks, tools and safety
  • 30-day check-in: confidence, questions and early wins

Days 31–60: contribute

Goal: handle a regular workload independently.

  • Read blueprints and erection drawings: independently
  • Signal cranes and rig steel members for lifting: independently
  • Guide beams and columns into position: independently
  • Bolt and weld connections: independently
  • Competency sign-offs completed (see checklist below)
  • Training final knowledge check and certificate of completion
  • 60-day check-in

Days 61–90: own

Goal: full productivity and a growth plan.

  • Meet productivity and quality targets for the role
  • Begin cross-training on a secondary task
  • Agree on a credential goal (for example, Apprenticeship completion)
  • Discuss the career path: Apprentice Ironworker → Journeyworker Ironworker → Foreman or Rigging Specialist
  • 90-day review

Competency checklist

Skill or taskTrainedObservedSigned off
Rig a Steel Beam for Lifting
Make a Bolted Connection
Signal a Crane Operator
Rigging and crane signaling
Steel connection
Bolting and torque
Structural welding

How to measure onboarding success

  • Weeks until the new hire works without close supervision
  • Recordable incidents and near-misses in the first 90 days
  • Rework caused by new-hire errors
  • Apprentice retention through year one

How Ironworker training maps to this plan

  1. Introduction to the Ironworker Role
  2. A Day on the Job
  3. Essential Ironworker Vocabulary
  4. Core Duties and Responsibilities
  5. Common Tasks, Step by Step
  6. Tools, Equipment and Technology
  7. Safety, Compliance and Professional Standards
  8. Skills Employers Look For
  9. Launching Your Ironworker Career
  10. Final Knowledge Check
Get team pricing
Team pricing