Onboarding plan

Wind Turbine Technician Onboarding Plan (30-60-90 Days)

A practical, printable plan to take a new wind turbine technician from first day to full productivity.

Updated By the Career Education Institute Curriculum Team
Wind Turbine Technician onboarding at a glance

Week one covers orientation, safety and shadowing. Days 1–30 build vocabulary and supervised practice on core procedures; days 31–60 move to independent work with competency sign-offs; days 61–90 focus on full productivity, cross-training and a credential plan.

Before day one

  • Confirm start date, schedule, pay and supervisor in writing
  • Verify required credentials: GWO Basic Safety Training, GWO Basic Technical Training (as applicable)
  • Prepare equipment and access: full-body harness, lanyards and descent devices; hydraulic torque and tension tools; multimeters and diagnostic laptops; SCADA monitoring systems
  • Assign a buddy or preceptor
  • Enroll the new hire in Wind Turbine Technician training so foundations are covered before or during week one

Week one: orient and protect

  • Workplace tour, emergency procedures and incident reporting
  • Inspect fall protection before every climb and stay tied off
  • Lock out the turbine and rotor before entering the hub or working on systems
  • Respect wind speed limits for climbing and work
  • Always work with a partner and know the rescue plan
  • Shadow an experienced wind turbine technician through a full shift
  • Training modules 1–3: role foundations, a day on the job and essential vocabulary (15 terms)

Days 1–30: learn

Goal: perform core tasks safely under supervision.

  • Supervised practice: inspect a full-body harness before climbing
  • Supervised practice: torque bolts to specification
  • Supervised practice: troubleshoot a turbine fault using SCADA
  • Training modules 4–7: duties, step-by-step tasks, tools and safety
  • 30-day check-in: confidence, questions and early wins

Days 31–60: contribute

Goal: handle a regular workload independently.

  • Climb towers and work at heights using fall protection: independently
  • Perform scheduled inspections and preventive maintenance: independently
  • Troubleshoot electrical, mechanical and hydraulic systems: independently
  • Replace components such as bearings, filters and sensors: independently
  • Competency sign-offs completed (see checklist below)
  • Training final knowledge check and certificate of completion
  • 60-day check-in

Days 61–90: own

Goal: full productivity and a growth plan.

  • Meet productivity and quality targets for the role
  • Begin cross-training on a secondary task
  • Agree on a credential goal (for example, GWO Basic Safety Training)
  • Discuss the career path: Entry-Level Wind Technician → Wind Technician II or Lead Tech → Specialist
  • 90-day review

Competency checklist

Skill or taskTrainedObservedSigned off
Inspect a Full-Body Harness Before Climbing
Torque Bolts to Specification
Troubleshoot a Turbine Fault Using SCADA
Working at heights and rescue
Electrical troubleshooting
Hydraulic and mechanical maintenance
Bolt torquing and tensioning

How to measure onboarding success

  • Weeks until the new hire works without close supervision
  • Recordable incidents and near-misses in the first 90 days
  • Rework caused by new-hire errors
  • Apprentice retention through year one

How Wind Turbine Technician training maps to this plan

  1. Introduction to the Wind Turbine Technician Role
  2. A Day on the Job
  3. Essential Wind Turbine Technician Vocabulary
  4. Core Duties and Responsibilities
  5. Common Tasks, Step by Step
  6. Tools, Equipment and Technology
  7. Safety, Compliance and Professional Standards
  8. Skills Employers Look For
  9. Launching Your Wind Turbine Technician Career
  10. Final Knowledge Check
Get team pricing
Team pricing