Free practice test

Industrial Engineer Practice Test

Check what you know about the industrial engineer job with 15 free questions and instant explanations.

Updated By the Career Education Institute Curriculum Team
About this practice test

15 multiple-choice questions on industrial engineer knowledge, safety and vocabulary. Submit to see your score and explanations, or open any question’s answer as you go. Nothing is saved or shared.

Question 1 of 15Takt time is:
Show answer

Answer: Pace to meet demand. Pace.

Question 2 of 15Poka-yoke means:
Show answer

Answer: Mistake-proofing. Prevention.

Question 3 of 15A VSM shows:
Show answer

Answer: Material and info flow. Flow.

Question 4 of 15DMAIC is used in:
Show answer

Answer: Six Sigma. Method.

Question 5 of 15Line balancing:
Show answer

Answer: Evens out work. Flow.

Question 6 of 15Which term matches this definition: “Pace to meet demand.”
Show answer

Answer: Takt time. Takt time: Pace to meet demand.

Question 7 of 15What does “Kanban” mean?
Show answer

Answer: Pull signal system.. Kanban: Pull signal system.

Question 8 of 15Which term matches this definition: “Map of movement.”
Show answer

Answer: Spaghetti diagram. Spaghetti diagram: Map of movement.

Question 9 of 15What does “Standard work” mean?
Show answer

Answer: Best method documented.. Standard work: Best method documented.

Question 10 of 15Which term matches this definition: “Time to complete one unit.”
Show answer

Answer: Cycle time. Cycle time: Time to complete one unit.

Question 11 of 15What does “Poka-yoke” mean?
Show answer

Answer: Mistake-proofing.. Poka-yoke: Mistake-proofing.

Question 12 of 15Which term matches this definition: “Statistical process control.”
Show answer

Answer: SPC. SPC: Statistical process control.

Question 13 of 15What does “Line balancing” mean?
Show answer

Answer: Evening out work across stations.. Line balancing: Evening out work across stations.

Question 14 of 15Which term matches this definition: “Map of material and info flow.”
Show answer

Answer: Value stream map. Value stream map: Map of material and info flow.

Question 15 of 15What does “Capacity planning” mean?
Show answer

Answer: Matching resources to demand.. Capacity planning: Matching resources to demand.