Question 1 of 15Grounding prevents:
Show answer

Answer: Static sparks. Safety.

Question 2 of 15Placards must:
Show answer

Answer: Match the product. Hazmat.

Question 3 of 15Outage is:
Show answer

Answer: Space left in a tank. Term.

Question 4 of 15Ground:
Show answer

Answer: Before connecting. Sequence.

Question 5 of 15In a spill:
Show answer

Answer: Stop flow. Response.

Question 6 of 15Which term matches this definition: “Shipping document.”
Show answer

Answer: Bill of lading. Bill of lading: Shipping document.

Question 7 of 15What does “PPE” mean?
Show answer

Answer: Personal protective equipment.. PPE: Personal protective equipment.

Question 8 of 15Which term matches this definition: “Arm for connecting tanks.”
Show answer

Answer: Loading arm. Loading arm: Arm for connecting tanks.

Question 9 of 15What does “Pinch point” mean?
Show answer

Answer: Place where body parts can be caught.. Pinch point: Place where body parts can be caught.

Question 10 of 15Which term matches this definition: “Hazmat sign.”
Show answer

Answer: Placard. Placard: Hazmat sign.

Question 11 of 15What does “Dome” mean?
Show answer

Answer: Top opening of a tank car.. Dome: Top opening of a tank car.

Question 12 of 15Which term matches this definition: “Space left in a tank.”
Show answer

Answer: Outage. Outage: Space left in a tank.

Question 13 of 15What does “Vapor recovery” mean?
Show answer

Answer: Captures fumes.. Vapor recovery: Captures fumes.

Question 14 of 15Which term matches this definition: “Material being moved.”
Show answer

Answer: Load. Load: Material being moved.

Question 15 of 15What does “Lockout/tagout” mean?
Show answer

Answer: Energy isolation before servicing.. Lockout/tagout: Energy isolation before servicing.