Industrial Production Manager how-to

How to Raise OEE on a Production Line

OEE shows where capacity is lost.

Updated By the Career Education Institute Curriculum Team
Quick answer

OEE shows where capacity is lost. In short: measure; find; track, then complete the remaining steps below.

Step by step

  1. Measure availability, performance and quality.

  2. Find the biggest loss.

  3. Track downtime reasons.

  4. Fix the top cause.

  5. Standardize the fix.

  6. Measure again.

Safety reminders for industrial production managers

  • Lead a strong safety culture
  • Investigate every incident
  • Enforce lockout/tagout
  • Maintain machine guarding

OEE · Throughput · Downtime · Scrap rate · Lean · Kaizen: see the full industrial production manager glossary.

More industrial production manager how-to guides

Enroll in trainingTake fit quiz