Free practice test

Industrial Production Manager Practice Test

Check what you know about the industrial production manager job with 15 free questions and instant explanations.

Updated By the Career Education Institute Curriculum Team
About this practice test

15 multiple-choice questions on industrial production manager knowledge, safety and vocabulary. Submit to see your score and explanations, or open any question’s answer as you go. Nothing is saved or shared.

Question 1 of 15OEE measures:
Show answer

Answer: Equipment effectiveness. Metric.

Question 2 of 15Takt time is:
Show answer

Answer: Pace to meet demand. Pace.

Question 3 of 155S starts with:
Show answer

Answer: Sort. Order.

Question 4 of 15Daily meetings start with:
Show answer

Answer: Safety. Priority.

Question 5 of 15Kaizen means:
Show answer

Answer: Continuous improvement. Improvement.

Question 6 of 15Which term matches this definition: “Overall equipment effectiveness.”
Show answer

Answer: OEE. OEE: Overall equipment effectiveness.

Question 7 of 15What does “Standard work” mean?
Show answer

Answer: Best known method.. Standard work: Best known method.

Question 8 of 15Which term matches this definition: “Maximum output.”
Show answer

Answer: Capacity. Capacity: Maximum output.

Question 9 of 15What does “Downtime” mean?
Show answer

Answer: Time machines aren’t running.. Downtime: Time machines aren’t running.

Question 10 of 15Which term matches this definition: “Cost to make one item.”
Show answer

Answer: Cost per unit. Cost per unit: Cost to make one item.

Question 11 of 15What does “Throughput” mean?
Show answer

Answer: Units made per time.. Throughput: Units made per time.

Question 12 of 15Which term matches this definition: “Pace needed to meet demand.”
Show answer

Answer: Takt time. Takt time: Pace needed to meet demand.

Question 13 of 15What does “Lean” mean?
Show answer

Answer: Eliminating waste.. Lean: Eliminating waste.

Question 14 of 15Which term matches this definition: “Slowest step.”
Show answer

Answer: Bottleneck. Bottleneck: Slowest step.

Question 15 of 15What does “Scrap rate” mean?
Show answer

Answer: Share of bad parts.. Scrap rate: Share of bad parts.